top of page

ViaDuctors

" Build, Test ,Triumph"

​The bridge assembly competition serves as a platform to assess     students' creative thinking by enabling them to apply acquired knowledge in constructing a bridge prototype. Open to anyone with an interest in crafting the optimal bridge using readily available materials, this event invites teams of three members to utilize items such as bamboo sticks and cables to fashion a miniature model.

Round 1 :

Initially the participants are showcased with some of the bridge models to get familarise with the design of the flyovers. Followed with the Quiz competition. The participants will be shortlisted and the top scorers will be given some advantage on the following round.

 

Round 2 :

The heart of the event commences at this stage, where essential materials such as bamboo sticks, broom sticks, and spaghetti are provided for bridge construction. Winners of the first round enjoy an advantage in this phase. Participants are allotted a specific timeframe to complete their bridges, with assessment carried out by the designated evaluators.

SCORING CRITERIA

  • Completion time

  • Maximum load that the model can withstand

  • Application of engineering and physics principles

  • Innovation

TEAM SIZE : 2 or 3

bottom of page